Electric train EN3

EN3 – experienced Yeelectric train NOvocherkassky, type - 3. Issued in 2000 year on Novocherkassk Electric Locomotive Plant. Built 1 composition.

Creation of the EN3 electric train at the Novocherkassk Electric Locomotive Plant (NEVZ) was initiated as part of a program to update the fleet of commuter trains and replace outdated trains of the series ER9. After the cessation of production of electric freight locomotives VL85 and VL80S in the mid-1990s, the plant received the task of developing passenger electric trains. Initially, it was planned to create the EN1 series with a collector thyristor drive, however, successful tests of a prototype section with asynchronous motors on an experimental ring forced the designers to reconsider the concept.

As a result of the joint work of NEVZ specialists, VElNII and other specialized enterprises in 1996 year, a decision was made to develop the EN3 electric train using an asynchronous traction drive. Project documentation completed in 1998 year with the participation of the Demikhovsky Machine-Building Plant (bodies and bogies) and "Sibstankoelektroprivoda" (traction inverter and microprocessor control system).

The EN3 electric train is designed to operate on AC traction networks 25 kV. The main feature of the design is an asynchronous traction drive with a power 350 kW per motor car, which made it possible to reduce the weight of engines and simplify their maintenance compared to collector analogues. The control system is based on thyristor regulation with regenerative braking function.

The composition of the electric train provided for the formation of single (5-9 carriages) and double trains. The carriages were divided into 3 type: trailed head (Pg) with control cabin, motor intermediate (Mp) with pantographs + traction electric motors and trailed intermediate (Pp). Due to the overall dimensions of the traction equipment, some of the cooling systems were moved to special cabinets in the vestibules, which required adjustments to the interior layout.

The prototype EN3-001 was assembled in December 2000 year. During tests on the VNIIZhT ring, critical errors in the design of the traction converter were identified: the device was subjected to overheating above permissible standards, which made it impossible to undergo certification and admit the train to passenger transportation.

Despite the lack of a certificate, the train was purchased by the North Caucasus Railway for additional improvements. For several years the train was in the PM-4 depot (Rostov-Glavny) and performed test flights without passengers. In 2013 year, the wagons were distributed among stock bases, and one of the head cars entered the museum of railway technology. In 2019 year all carriages of the train, including an exhibit from the museum, were transported to the Bataysk building structures plant and disposed of.

Peculiarities:

Modifications:

Specifications:

G – head, M – motor, P – trailed, B - bar car

Operation:

Predecessors:

Followers: