Automotrisa 610M
Issued in 2004 year. Built 1 unit.
TRAXX H80 AC – THRUSH - platform, H80 - type, AC - AC. Issued in 2000-2004 and 2009-2013 years on Adtranz and Bombardier Transportation. Built 34 electric locomotive.
On the right (IORE) – family name of Swedish superelectric locomotives, created by Adtranz Adtranz and its successor Bombardier Transportation for the mining company LKAB and its operator Malmtrafik. It's heavy, cold-resistant version of the Octeon/TRAXX modular platform, designed specifically to transport super-heavy iron ore trains from the LKAB mines in Kiruna, Svappavaare and Malmberget in Sweden to Luleå on the Baltic Sea in Sweden and Narvik on the Norwegian Sea in Norway.
The power of one section is 5400 kW (10 800 kW per electric locomotive) and tractive effort 600-700 kN. This makes it possible to transport trains from 68 wagons and weighing ≈8600 tons at a speed of ≈60-80 km/h. The electric locomotive is powered by AC power 15 kV 16,7 Hz.
High grip weight and thicker body walls increase durability when driving through deep snow drifts. Electric locomotives are designed and equipped with an eye to reliability and ease of maintenance in the harsh northern climate: modular converters, isolated compartments, sophisticated security system for access to high-voltage cabinets.
Iore takes LKAB rail logistics to a new level: By increasing the weight of trains and the axle load, together with the modernization of the tracks, we made it possible to sharply increase throughput - fewer shipments with a larger annual cargo transportation. Thanks to the energy recovery system, Empty trains are accelerated using recovered energy.