Arrow_up

Automotrisa PD1

PD1 – Ppassenger Drubber, type - 1. Issued in 1953-1974 years on Demikhovsky Machine-Building Plant and plant named after Ya. M. Sverdlova. Built 65 units.

The PD1 railcar is a unique narrow-gauge three-axle vehicle, developed in 1953 year at the Sverdlov plant in Gorky (Nizhny Novgorod). Initially, in 1951-1952 years, The Sverdlov plant began production of biaxial sanitary railcars SMD-1, which were designed based on unification with other models, such as GMD-1 (cargo) and PMD-1 (fire department). In 1953 year, the plant switched to the production of passenger three-axle railcars PD1, which were released before 1954 year. After this, the documentation was transferred to the Demikhovsky Machine-Building Plant, where production continued until 1974 year.

The railcar has a metal body, inside which there are seats for the driver and 10 passengers. The sanitary version of SMD-1 provides space for a paramedic and the installation of two stretchers. The body was originally assembled using rivets, but later welding was introduced, which significantly increased the strength of the structure. The body is mounted on a welded frame, specially designed for this trolley.

The engine is located in the front part under the hood, which was originally represented by the GAZ-MM model (50 hp.), and then replaced by M-20 (50 hp.) and M-21 (75 hp.). The engine transmits rotation to the rear wheelset through a clutch and a four-speed gearbox. The interior is upholstered with plywood and divided into two parts by a partition.: driver's cabin and passenger compartment. The interior includes soft seats, and the floor is covered with linoleum. To ensure passenger comfort in the cold season, heating is provided, which works on the basis of hot air, supplied from the engine.

The PD1 railcar was used for various purposes, including inspection trips along railway routes and short-distance passenger transport. Thanks to its design and maneuverability, PD1 has become an indispensable means of transportation for narrow-gauge railway workers, allowing you to quickly and efficiently check the condition of tracks and infrastructure. Later, the plant mastered the production of motor railcars PD2.

Peculiarities:

Modifications:

Specifications:

Operation:

You can add to the article:

Telegram logo Open our Telegram chat

Or find a group @railtrain_chat

Similar series: