Self-propelled power plant SEP4

SEP4 – Sself-propelled YelectroPsubstation, type - 4. Issued in 1961 year on Demikhovsky Machine-Building Plant. Built 1 unit.

A self-propelled experimental power plant was developed and built at the Demikhovsky Machine-Building Plant (DMZ) in response to the need to improve the laying of temporary railway tracks. In the late 1950s, it was proposed to use enlarged 10-meter links instead of the traditional 8-meter ones. This reduced labor costs for fastening tracks and speeded up their laying..

In 1960 DMZ produced an experimental track-laying train PPR3, which featured an original design: platforms and head crane were connected by three-axle trolleys, and the self-propelled power plant SEP3 was used as a power unit. It was equipped with a D-54 diesel engine and a SG35-6 generator with a power 35 kVA. However, the PPR3 design turned out to be unsuccessful, and further development of the project did not take place.

Based on the experience gained in 1961 a new track-laying train was developed, which also used links length 10 meters. To supply it with electricity, a self-propelled power station SEP4 with a similar design SEP3 was built, but with an electric generator from SEP2M and was equipped with pneumatic brakes. The new SEP4 was transferred to the Vasilievsky Mokh peat enterprise in the Tver region.

Despite its innovative characteristics, SEP4 also could not find widespread use and was soon converted into a pump car for a fire train. In 2008 year remaining parts (body on trolleys) were rescued and are stored in the North-West Railway Museum.

Peculiarities:

Modifications:

Specifications:

Operation:

Predecessors:

Similar:

You can add to the article:

Telegram logo Open our Telegram chat

Or find a group @railtrain_chat

Similar series: