Diesel train DRB1
Issued in 1994-2006 years. Built 24 composition.
4DDSR Class 4DD – Southern Railway 4 Double-Decker coach (Yuzna railway, 4 Ddouble-decker carriages). Issued in 1949 year on English Electric and Lancing and Eastliegh Works. Built 2 composition.
In the second half of the 1940s, the SR railway company became interested in increasing the capacity of electric trains on suburban services.. This was due to the increase in passenger traffic in the UK after the Second World War due to the small number of motor vehicles for the majority of the population.
There were two solutions to this problem:
Full double-decker trains, like self-propelled, it was impossible to operate trailed ones due to the too small size of engineering structures (bridges, tunnels) UK rail transport. The height from the rail to the inside of the bridge truss or from the rail to the ceiling of the tunnels is too low. This problem has not been resolved to date (January 2021 G.).
Chief Engineer SR Oliver Bulleid, at the beginning 1948 year (shortly before the nationalization of the UK railways) developed an experimental two-level electric train of his own design. It is not known for certain whether his idea is his own or whether he used existing experience from the USA, where already with 1932 similar trains were built over the years, but with center gangway in the middle PRR MP70 for Long Island Rail (Long Island Railroad).
The essence of the design is a checkerboard arrangement of seats on a train.. In view of the common practice of entering trains from the side at that time in Great Britain (each compartment has its own door) number of places in 1 4DD electric train car more, than in the American counterpart.
Construction of electric trains 4DD took place after the nationalization of railway transport in Great Britain, this was due to the fact that after nationalization the local administrations of the former private railways continued to work locally, including engineer Oliver Bulleid.
The first train No. 4001 was built in September 1949 G., and in October 1949 G. the second train No. 4002 was ready.
In 1950, there was a change in course in solving the problem of increased passenger traffic, instead of building an experimental two-level MVPS, BR management decided to increase the length of the platforms. In the same 1950 year, Oliver Bulleid left BR. Together, these two events caused the closure of the project 4DD.
Due to the fact that the electric train was designed and built in a short time, there were many shortcomings in the design related to the maintenance of rolling stock, and with the comfort of passengers. There were constant complaints about the trains from both railway employees, and from passengers. An important fact is that these electric trains are also periodically under repair..
The only positive aspect of the existence of this train was its large passenger capacity. 4 or 8 4DD wagon trains compared to single-deck electric trains, this was the main reason that covered all the shortcomings of the train.
For inexplicable reasons, the experimental series 4DD despite all the ambiguous aspects of the design, it served on the road 22 years and was written off only in 1971 year, at the same time as on British Railway (UK National Railways) second generation MVPS began to appear.
To this day, two motor cars No. 13003 and No. 13004 from train No. 4902 have survived (4002), which are planned to be restored to working condition.
G – head, P – trailed
Author of the article: Yushchenko Andrey

Issued in 1994-2006 years. Built 24 composition.

Issued in 1962 year. Built 20 electric locomotives.

Issued in 1952-1959 years. Built 75 electric locomotives.

Issued in 1989-2007 years. Built 549 diesel locomotives.