Arrow_up

Electric locomotive 2ES9

2ES9 – 2-x sectional, Yeelectric train Sprojection, type - 9. May be available with 2027 year for Novocherkassk Electric Locomotive Plant. Under construction 1 electric locomotive.

Russian Railways and TransMashHolding are working on the creation of a new AC electric locomotive (25 kV) with asynchronous motors for the Baikal-Amur Mainline. Expected, that this electric locomotive will be able to transport trains weighing up to 7100 tons at a rate 120 km/h. It will consist of two sections and will be supported by 3-axle bogies. The design is made in a modern style, characteristic of TMH products.

For October 2026 the first electric locomotive was built, which will be tested on the VNIIZHT ring.

Peculiarities:

Specifications:

Operation:

Predecessors:

You can add to the article:

Telegram logo Open our Telegram chat

Or find a group @railtrain_chat

Similar series: