81-740 / 41 – 81 - near metro trains, 7 - Mytishchi plant index, 40 - head, 41 - intermediate. Issued in 2002-2013 years on Metrowagonmash. Built 40 carriages.
Rusich appeared at the same time as the metro train 81-720 "Yauza", but was more modified because, which was planned more carefully and with a specific purpose. Rusich's main task is to move through more curved tunnels, than existing metro trains. The electric train is also designed for operation on long open sections and these trains do not have emergency exits in the head cars.
Each car consists of two articulated sections with free passage between them. This car is placed on three bogies: extreme – motor, and the middle trolley is supporting. The size of the carriage is the smallest of all, after all, it was not designed to work with large passenger flows. Rusich can work in a tunnel with a diameter of 4,5 meters, but works in tunnels 5-6 meters.
The seats in the cars are located close to the floor and many people find it uncomfortable to sit on them., as well as standing at full height near the doors. The windows are also low and people, who stand often look out the window, which opens for ventilation. In the first versions there was only 2 doors in one carriage. However, they are quite narrow and take a very long time to open.. Tamware doors are used. In later versions for the Circle Line the number of doors was increased to 3, but that didn't help the situation much.
Factory designation:
Motor-head – 81-740
Motor-intermediate – 81-741
Peculiarities:
For open-air work, the heating and ventilation system in the cars has been improved
The cars have an articulated design 27-28 meters long, Passengers can move between pairs of carriages
Such double carriages are located on 3 trolleys - medium, Jacobs designs, supports two cars at once and is a supporting, extreme ones - wrapped
Car 0210 injured during an accident on the Victory Park section of Slavyansky Boulevard 15 July 2014 year
1 experienced staff (0001-0501-0002) used as a trainer
Modifications:
81-740A (built 3 carriage) – domestic KATP-1 engines with power 170 kW
81-740.1 (built 378 carriages) – modernized interior heating and ventilation system
81-740.2 (built 27 carriages) – export, for Sofia Metro in Bulgaria with Hhitachi drive
81-740.2B (built 93 carriages) – export, based on modification 81-740.4 with Hhitachi drive
81-740.3 (released 1 copy) – three-door with forced ventilation
81-740.4 (built 326 carriages) – installation of three passenger doors instead of two and air conditioners from the Spanish company MERAK for busy lines
81-740.4K (built 9 carriages) – for Kazan with installed air conditioners in the cabin
81-740.1 0176
81-740 0025
81-740.2 2016
81-740.4 0155 salon
81-740.1 0035 cabin
Specifications:
G – head, P – intermediate
Capacity – 2×344 people. (G) and N×370 people. (P)