Arrow_up

Alstom Prima II electric train platform

Alstom Prima II – Alstom - manufacturer, Prima - series, II - 2 generation. Available with 2009 year for Alstom. Built 595 electric locomotives.

20 May 2008 Alstom announced the second generation of Prima locomotives, called "Prime II". Prototype presented 3 June 2009 year at the Alstom plant in Belfort (France). This locomotive is a platform for the design of serial electric locomotives, taking into account the modular design and the possibility of re-equipment in accordance with customer requirements.

Electric locomotives can operate with 4 different contact line voltages: 1,5 and 3 kV DC, and also 15 and 25 kV AC. The locomotive power output reaches 6,4 MW, and the operating speed varies from 140 to 200 km/h. Alstom has also included the possibility of changing the track width, suitable for work in India, Russia and Finland. Besides, locomotives are compatible with the ERTMS signaling system for operation in Europe.

The first order for Prima II locomotives was made by the National Railways of Morocco (ONCFM) in November 2007 year for 20 electric locomotives under the series ONCFM E 1400. In February 2018 year ONCFM placed another order for 30 electric locomotives.

In November 2015 Alstom received a contract from the Indian Ministry of Railways for the supply 800 two-section freight electric locomotives WAG-12, as well as long-term maintenance. The total contract value exceeds 3 billion euros and includes the creation of a new assembly plant in Madhepura (state of Bihar in India), and also 2 maintenance depot at Saharanpur (state of Uttar Pradesh) and Nagpur (state of Maharashtra). The Indian version has increased power 9 MW, but the speed is reduced to 120 km/h.

S 2011 by 2021 year in Russia, Alstom Prima II electric locomotives were manufactured in collaboration with the Novocherkassk Electric Locomotive Plant under the series EP20 "Olymp". As a result, it was built 80 units, which are actively used in passenger transportation for high-speed trains in the Western part of the country. The same orders were completed for Azerbaijan - AZ4A (passenger, were issued in 2017-2019 years, built 10 electric locomotives), AZ8A (two-section cargo, were issued in 2018 year, built 40 units) and Kazakhstan – KZ8A (two-section cargo, are issued with 2012 year, built 170 units).

Peculiarities:

Modifications:

Specifications:

Operation:

Predecessors:

Followers:

You can add to the article:

Telegram logo Open our Telegram chat

Or find a group @railtrain_chat

Similar series: