Arrow_up

Electric train EM2

EM2 – Yeelectric train MOskovsky based on ER2. Issued in 2002-2006 years on Moscow Locomotive Repair Plant and Riga Carriage Works. Modernized 35 compositions.

In the mid-1990s, domestic railways were faced with the problem of mass decommissioning of outdated electric trains. ER2 and ER9 due to exceeding standard service life. To maintain the fleet in conditions of limited supplies of new cars, a capital restoration program was developed with a service life extension of 15 years. K 2003 technologies were approved, regulatory and technical documentation and the basic enterprises for carrying out repairs were identified - Moscow locomotive repair and Krasnoyarsk carriage repair plants. The first electric train after the KRP received an index "K" in series designation, but later the letter was removed.

At the same time, the development of a concept for modernization of rolling stock was carried out, providing for the introduction of new systems and equipment. In 2000 in the year AO "Specremont" proposed the idea of ​​​​creating a new generation electric train, designated EM2. However, attempts to rename the series to "Electric train Moskovsky" (EM) were not successful due to difficulties with certification and permission to operate. K 2005 this initiative had to be abandoned.

Modernized EM2 electric trains received updated driver's cabins, traction and coupling equipment. Major changes included replacing the front section of the head car to improve working conditions for the crew and creating a recognizable style. Modern plastics are used in the interiors, double glazed windows, fluorescent lighting, information boards, fire extinguishing and video surveillance systems. The design of ventilation and heating has also been changed.

The operation of EM2 electric trains revealed a number of problems, related to the increase in the weight of cars and the reliability of components. Frequent breakdowns led to long downtime at the depot, and after several years of operation, such trains were transferred to settling tracks and written off. Despite modernization, The PRC was seen as a temporary measure, a bridge to the creation of new generation electric trains. The decision on the feasibility of such modernization depended on the cost of the work - if carried out by JSC "Specremont" it was considered profitable.

Other designations:

Peculiarities:

Modifications:

Specifications:

G – head, M – motor, P – trailed

Operation:

Predecessors:

Followers:

Telegram logo Open our Telegram chat

Or find a group @railtrain_chat

Similar series: