Diesel-electric train Stadler FLIRT
Available with 2004 year. Built 1128 compositions.
SPT Glasgow – Strathclyde Partnership for Transport (Ttransport Ppartnership Sin Tratklay), 3-e generation of Glasgow metro trains. Issued in 2023-2024 years on Stadler. Built 17 compositions.
Glasgow metro train, serving one of the oldest underground systems in the world, went through a long evolution. First generation of cars, appeared back in 1896 year, worked on rope traction until 1935 year. After the trains were switched to electric traction with direct current 600 In. After 80 years of service, these trains were taken out of service in 1977 year in connection with large-scale modernization of the metro.
The second generation of rolling stock has been in operation since 1980 by 2024 year, consisted of 33 motor and 8 trailer cars, built by Metro-Cammell. The cars had a narrowed gauge 1220 mm, what makes them different from most British railway systems, and were equipped with a thyristor-pulse traction motor control system. The original paint job was light orange with a white stripe and was soon replaced by dark orange with black window frames., and in 2006 year - to creamy red. Some carriages were used for advertising on the middle carriage. In 2024 year, after 44 years of operation, the second generation is completely out of service, and some of the carriages were preserved for museums.
Third generation of trains, developed by the Swiss company Stadler Rail, are four-car trains with open vestibules and through passages between cars. The cars are equipped with TSA TMW asynchronous traction motors 28-23-4 power 68 kW with frequency regulation. Electricity supply is provided through 3 rail voltage 600 In permanent current, and the coupling is made according to the Scharfenberg system.
Trains have an automatic control system, although initially they were operated with a driver. In December 2023 new trains began operating, and to the middle 2024 years they completely replaced the previous generation. The entire Glasgow metro system consists of a circular bi-directional line and 15 stations. The track width is still 1220 mm, and the diameter of the tunnels 3350 mm. Development plans include the installation of a modern radio-based traffic control system and the introduction of platform doors, which will allow the transition to fully autonomous operation.
1 – head, 2 – intermediate

Available with 2004 year. Built 1128 compositions.

Issued in 2013 year. Built 1 composition.

Issued in 1947-1949 years. Built 20 steam locomotives.

Available with 2017 year. Built 55 units.