Electric locomotive BKG2
Issued in 2015-2017 years. Built 18 electric locomotives.
SM-7N – Snon-harvest Mfamiliar, type - 7, Nself-propelled. Issued in 2004-2023 years on Transmash. Built 25 car.
Snowy winters can create significant obstacles for rail transport, causing delays and complicating the work of all personnel. To prevent such situations and ensure smooth train movement, railway companies use specialized equipment. One of the most modern and effective solutions in this area is the SM-7N snow blower, which is an improved version of its predecessor SM-2 (were issued with 1965 by 2002 year).
Snow removal train SM-7N is designed for removing snow and ice on station tracks, turnouts and necks in winter, and also for clearing paths of debris in summer. This train collects snow and ice into gondola cars., which are then transported and unloaded in designated areas. The movement of the snow removal train is provided by a diesel locomotive of any series, and coordination of work is carried out via radio.
The SM-7H train consists of:
The lead car of the train is responsible for clearing the tracks using its wings, side brushes and feeder, which transfers snow to the conveyor. The snow is then transported to the end gondola car, where does unloading take place?. This system ensures fast and safe cleaning, minimizing the impact on railway operations. Besides, the machine is equipped with an efficient unloading system using a transverse ejection conveyor, which allows you to unload snow from a distance 5-10 meters from the track axis.