Diesel locomotive TGM14
Issued in 1984 year. Built 1 diesel locomotive.
TE8 – Teplovoz s Yeelectric transmission, 8-basic. Issued in 2012 year on Lyudinovo Diesel Locomotive Plant. Built 16 diesel locomotives.
The TE8 diesel locomotive was developed in 2010-2011 years according to technical specifications, formed with the participation of General Electric specialists under the leadership of A.V.. Kurchatova and A.G.. Hryhoryan. Design documentation was created by TsIR STM in 2011-2012 years with the involvement of OKB "Automation" and Lyudinovsky plant. Among the key developers were I.V.. Serebryakov, A.V. Zubikhin, M.L. Roginsky, V.V. Kobylyansky and others. The preliminary design was presented in March 2012 year, and the first prototype rolled off the assembly line 28 November 2012 year.
The locomotive is a single-section 8-axle diesel locomotive with AC electric transmission and a hood-type body. SuperSkid powerplant (General Electric) equipped with a 12-cylinder diesel engine with power 3300 hp., with the possibility of increasing to 4000 hp. according to customer's request. The equipment includes a traction generator 5GTA24, traction electric motors ED133, BrightStar control system, rheostatic brake and modular cabin with improved noise- and thermal insulation. The locomotive is adapted for operation in the temperature range from -50°С to +40°С, designed for ruts 1520 mm and can be used in curves with a radius of at least 125 m.
Operation of TE8 began in December 2012 years after testing. 15 locomotives were transferred to LLC "Mechel Trans Vostok" for work on the line Ulak – Elga (Yakutia), where they are used to transport coal from the Elga deposit. According to reviews from operators, real characteristics exceeded design ones. Delivery was previously planned 18 diesel locomotives for OJSC "WHITE "Railways of Yakutia", but the agreement was terminated, and further production was curtailed.