TU2 – Telectric train Ulow gauge, type - 2. Issued in 1955-1958 years on Kaluga Machine-Building Plant. Built 281 diesel locomotive.
In the early 1950s, the Kaluga plant was tasked with creating a narrow-gauge diesel locomotive for operation on the main railways of the forestry and peat industries.. The locomotive body has 2 cabins and engine room in the center.
In 1954 a prototype was built, and with 1955 mass production began. Some diesel locomotives from industrial enterprises were transferred to children's railways in the cities of the USSR and the current CIS. Today the diesel locomotive is outdated and is being written off en masse.
Factory designation:
MEU-1 – Mfreight truck with Yeelectric transmission, Ulow gauge, type - 1
Peculiarities:
The design of the diesel locomotive is similar to mainline broad gauge locomotives, in the center of the body there is an engine room and there are 2 cabins
Slumped into the forest- and peat mining enterprises, later it was widely used on children's railways for training young railway workers
Equipped with a sandbox, pneumatic and hand brakes and can power cars with electric current
Modifications:
Was released 4 diesel locomotive TU2 under the rut 1000 mm, after changing it back to 750 mm
TU2K (TU2-078 and TU2-129) – Kstructurally modified, modernization on the Moscow ChRZ with new cabins
TU2M-244 – Mmodernized, improved exhaust system, An oil sump is installed on the roof
TU2mk – Mmodernized with reduced Kand then
TEU3-001 – Teplovoz s Yeelectric transmission, Ulow gauge, type - 3, 001 – serial number, modernized by Kharkov ChRZ on the basis of TU2-125