Arrow_up

Electric train ET4A

ET4A – experienced Yeelectric train TOrzhoksky, type - 4, with Asynchronous THEM. Issued in 2011-2013 years on Torzhok Carriage Works. Built 3 composition.

The ET4A commuter electric train has become a significant step in the modernization of Russian railway transport, designed to replace outdated models ER2, ER2R and ER2T. The development of this electric train was carried out by the St. Petersburg Central Research Institute of TEP (Central Research Institute"TransElectroPribor") in accordance with technical specifications, approved by Russian Railways in 2008 year.

The ET4A electric train is equipped with asynchronous traction electric motors ATD450 with a power 450 kW. Air conditioning is installed in each carriage, which provide an optimal microclimate with an accuracy of ±2°C. The train doors are equipped with a pneumatic drive and can be opened from the driver's cab, or using a button on the outside.

The first train of six cars was built in 2010 year, and after successful tests at VNIIZHT, The electric train received a certificate of technical conformity. Presentation of the first electric train ET4A-001 took place 8 June 2012 year, and already 9 June he made his first trip with passengers on the route St. Petersburg - Luga (Oktyabrskaya railway).

In 2014 year, a modernized version of the lead car was developed taking into account new safety requirements. Despite initial plans for mass production 30 copies, in the end, only three trains were built. The reason for the closure of the project was the decision to purchase a German electric train ES1 "Lastochka". On 2025 electric trains are being designed in Russia EP4Da and EP5Da with asynchronous traction motors.

Factory designation:

Peculiarities:

Specifications:

G – head, M – motor, P – trailed

Operation:

Predecessors:

Followers:

Telegram logo Open our Telegram chat

Or find a group @railtrain_chat

Similar series: